工艺技术工程师
奥麒化工(中国)有限公司
- 公司规模:150-500人
- 公司性质:外资(欧美)
- 公司行业:石油/化工/矿产/地质
职位信息
- 发布日期:2014-08-06
- 工作地点:苏州
- 招聘人数:1
- 工作经验:2年
- 学历要求:本科
- 语言要求:英语良好
- 职位月薪:面议
- 职位类别:产品工艺/制程工程师
职位描述
KNOWLEDGE AND COMPETENCIES(知识和能力)
QUALIFICATIONS(学历与资格证书)
本科 ,化学专业
EXPERIENCE(经验)
1年以上的工作经验
COMPETENCIES (能力)
a.化学分析
b.熟悉检测设备,仪器维护
c.实验室小试
JOB OVERVIEW(工作概述)
1熟悉生产工艺,协调解决生产中出现的工艺问题;
2对生产工艺进行优化,降低成本、提高生产产能,提高设备或操作安全性;
3新原料试验,验证;
4新产品转移至代加工商的技术支持(资料准备,员工培训,试生产);
5新产品小试;
6其他(工艺安全培训,5S等)
公司介绍
苏州龙沙化工有限公司是前美国奥麒化工公司在苏州独资设立的子公司,占地面积为62414.8平方米。苏州工厂于2005年开始投建, 整个项目分为三期建成: 一期项目行政办公楼及活性酵母精华(TRF)生产车间与实验室;二期项目生物杀菌剂(锌奥米啶ZPT /铜奥米啶CUPT)干燥与制粒以及三期项目生物杀菌剂(ZPT/CUPT)的生产, 整个工厂于2008年建成并成功试产, 2009年通过关键客户的产品认可和批准, 继而开始整个工厂的规模投产及运营。苏州工厂于2010年通过 ISO9001质量体系认证。2011年,龙沙集团收购奥麒集团。 继此,奥麒化工(中国)有限公司正式成为龙沙微生物控制业务部的一家生产厂。
Suzhou Lonza Ltd., is the wholly owned subsidiary of the former U.S. Arch Chemicals established in Suzhou, covering an area of 62,414.8m2. Suzhou plant started construction in 2005 and the entire project was built in three phases: Phase 1 project is administrative office and active yeast extract (TRF) production workshop and laboratory; Phase 2 project is biocides (Zinc Omadine ZPT / Copper Omadine CuPT) drying and granulation as well as Phase 3 project biocides (ZPT / CUPT) production, and the entire plant was completely built in 2008 and succeeded in trial production, and in 2009 after product recognition and approval by key customers, and then scale production and operations were started in the entire plant. Suzhou plant passed ISO9001 quality system certification in 2010. In 2011, Lonza Group acquired the Arch Group. Then Arch Chemicals (China) Co., Ltd., officially became a production plant of LMC.
Suzhou Lonza Ltd., is the wholly owned subsidiary of the former U.S. Arch Chemicals established in Suzhou, covering an area of 62,414.8m2. Suzhou plant started construction in 2005 and the entire project was built in three phases: Phase 1 project is administrative office and active yeast extract (TRF) production workshop and laboratory; Phase 2 project is biocides (Zinc Omadine ZPT / Copper Omadine CuPT) drying and granulation as well as Phase 3 project biocides (ZPT / CUPT) production, and the entire plant was completely built in 2008 and succeeded in trial production, and in 2009 after product recognition and approval by key customers, and then scale production and operations were started in the entire plant. Suzhou plant passed ISO9001 quality system certification in 2010. In 2011, Lonza Group acquired the Arch Group. Then Arch Chemicals (China) Co., Ltd., officially became a production plant of LMC.
联系方式
- 公司地址:上班地址:工业园区