Maintenance planner
奥麒化工(中国)有限公司
- 公司规模:150-500人
- 公司性质:外资(欧美)
- 公司行业:石油/化工/矿产/地质
职位信息
- 发布日期:2013-01-15
- 工作地点:苏州
- 招聘人数:1
- 工作经验:三年以上
- 学历要求:大专
- 语言要求:英语良好
- 职位类别:工程/设备主管 机电工程师
职位描述
Responsibility 工作职责:
1. Schedule & maintain Maintenance Plans and Tasks and Resources for existing and new assets.制定所有现有设备的维修计划工作及维修资源并对新设备建立相关维护计划.
2. Collaborate with maintenance engineer, storekeeper for Scheduled Work Order, Notification Management and Labor Hour allocation. Ensure spare parts availability.协同各专业工程师安排维修计划, 对工单进行人力安排, 确保工作所需的维修备件在维修前到位.
3. Analyze and review status of Work Order in SAP. Take report and improvement on initiative.定期分析及回顾维修管理系统中的维修工作情况,及时作出分析报告和改进意见
4. Monitor Stoppage Analysis and develop/adapt maintenance plan to ensure optimal operation and reduction of unplanned stoppages分析监控生产线设备停机纪录以优化维修计划,从而减少非计划停机.
5. Identify MOC before maintenance. WO’s requiring an MOC shall not be scheduled unless the MOC has been approved.识别并管理维修过程中的工艺变更,变更没有批准不实施。
6. Utilize Planned Downtime for Predictive and Condition-Based Maintenance with Work Orders合理利用计划停机时间安排维修工单及预防维护工作
7. Optimize Predictive Maintenance technologies优化预防性维护工作
8. Chair weekly maintenance meeting with team for recommend WO priority. 主持召开每周维修会议,确定维修工作中的工单安排及计划协调。
Qualifications required 任职资格:
Degree/Diploma in engineering, preferably mechanical or chemical mechanical engineering
大专或以上学历,主修机械或化工机械相关专业
Good oral and written English
良好的英语说写能力
Minimum 3 years industrial experience, preferable in chemical manufacturing.
至少3年在相关工厂方面的工作经验,尤其是化工制造公司。
公司介绍
Suzhou Lonza Ltd., is the wholly owned subsidiary of the former U.S. Arch Chemicals established in Suzhou, covering an area of 62,414.8m2. Suzhou plant started construction in 2005 and the entire project was built in three phases: Phase 1 project is administrative office and active yeast extract (TRF) production workshop and laboratory; Phase 2 project is biocides (Zinc Omadine ZPT / Copper Omadine CuPT) drying and granulation as well as Phase 3 project biocides (ZPT / CUPT) production, and the entire plant was completely built in 2008 and succeeded in trial production, and in 2009 after product recognition and approval by key customers, and then scale production and operations were started in the entire plant. Suzhou plant passed ISO9001 quality system certification in 2010. In 2011, Lonza Group acquired the Arch Group. Then Arch Chemicals (China) Co., Ltd., officially became a production plant of LMC.
联系方式
- 公司地址:上班地址:工业园区