plastic project manager
技阳塑料制品(上海)有限公司
- 公司规模:150-500人
- 公司性质:外资(欧美)
- 公司行业:原材料和加工 电子技术/半导体/集成电路
职位信息
- 发布日期:2012-08-02
- 工作地点:上海-闵行区
- 招聘人数:1
- 职位类别:模具工程师
职位描述
P.S. Please send the resume in English and Chinese.
1.Skills:
a.English : written, spoken fluent. Must be able to communicate in English with French customers
b.Technical skills in injection moulding process and Tooling design.
c.Experience in dealing with foreign customers.
d.CAD software (3D, 2D): basics
2.Position Descriptions:
1.Follow-up mould manufacture process for moulds manufactured by suppliers :
A- Launch meeting with mould project manager and mould department manager
B- Follow-up and validation of mould design
C- Inform customer about mould planning
D- Shots reporting: arrange with QC the control of the samples, define and launch mould adjustment with supplier
E- Samples management
F- Follow mould improvement / modifications
G- Assist mould department manager during hand over of mould to production department
2.Quotations
A- Send inquiry for quotation to suppliers chosen by TC Mould Manager
B- Ensure answer will be given within the lead time
C- Receive the quotation and transmit to TC Mould Manager
3.Production management department assistance
A-Ensure assistance to production management department if any help required, even if related mould manufacture has not been managed by himself.
B- Provide assistance if any repair action required on a mould
1.Skills:
a.English : written, spoken fluent. Must be able to communicate in English with French customers
b.Technical skills in injection moulding process and Tooling design.
c.Experience in dealing with foreign customers.
d.CAD software (3D, 2D): basics
2.Position Descriptions:
1.Follow-up mould manufacture process for moulds manufactured by suppliers :
A- Launch meeting with mould project manager and mould department manager
B- Follow-up and validation of mould design
C- Inform customer about mould planning
D- Shots reporting: arrange with QC the control of the samples, define and launch mould adjustment with supplier
E- Samples management
F- Follow mould improvement / modifications
G- Assist mould department manager during hand over of mould to production department
2.Quotations
A- Send inquiry for quotation to suppliers chosen by TC Mould Manager
B- Ensure answer will be given within the lead time
C- Receive the quotation and transmit to TC Mould Manager
3.Production management department assistance
A-Ensure assistance to production management department if any help required, even if related mould manufacture has not been managed by himself.
B- Provide assistance if any repair action required on a mould
公司介绍
本公司系外商(法国)投资的独资公司。主要生产加工塑料制品及塑料复合制品;模具设计、制作;金属(铝、镁、铁)合金制品及电子零件。销售自产产品,产品90%以上出口销往欧美、非洲各国。本公司XX产品于2000年10月获国家知识产权局颁发的外观设计专利证书。自2001年正式投资注册营运至今,我公司规模从5-10人的贸易型发展成为现今约300人的生产型企业。投资金额也于2004年增资50%,并扩建了7000㎡的厂房。由于我公司业务不断地拓展,诚聘以下优秀人才加入我司。
联系方式
- 公司网站:http://www.technochina.cn
- 公司地址:上海市闵行区颛桥镇颛兴东路1421弄152号(靠近向阳路)
- 邮政编码:201108
- 联系人:房小姐