项目进度控制主管
南京金浦英萨合成橡胶有限公司
- 公司性质:合资(欧美)
- 公司行业:原材料和加工
职位信息
- 发布日期:2013-01-15
- 工作地点:南京-六合区
- 招聘人数:1
- 职位类别:工程监理
职位描述
岗位职责main responsibilities:
1、负责对工程项目进行分解,编制和修订项目工作分解结构(WBS)、项目区域划分表,建立工程管理的基本单元;to breakdown project, preparing and revising project work breakdown structure (WBS), project area division list, establishing the basic units for project management.
2、编制项目总进度计划和项目主进度计划;to prepare project master schedule and project main schedule.
3、对项目的人力资源消耗进行统计并分析;to conduct statistics and analysis for project HR consumption.
4、编制实物进展测量办法,绘制进度测量基准曲线;to prepare the physical progress measurement approach, drawing progress measurement benchmark curve.
5、审查分包方提出的进度计划,提出审查意见报项目经理,并将分包方的进度计划纳入项目总进度计划;to review the schedule from subcontractors and provide review comments for project manager; the schedule from subcontractors shall be integrated with project master schedule.
6、协调设计、采购、施工各环节的进度计划,保证完成项目的总进度计划;to coordinate schedules for design, procurement and constructions to ensure the project master schedule will be achieved.
7、跟踪进度计划执行情况,对进度偏差进行分析和预测,发现问题,及时提出解决措施,定期书面向控制经理报告项目进度计划的执行情况;to follow up project schedule implementation status, analyzing and predicting the deviations, discovering problems and providing solutions; to submit written report to control manager regularly for project schedule implementation status.
8、负责制定、跟踪、协调和修订项目进度计划;to prepare, follow up, coordinate and revise project schedule.
9、熟悉公司的HSE管理体系,执行项目的HSE实施计划的各项要求;to be familiar with HSE management system, conducting all requirements of HSE implementation schedules.
10、对本人的进度控制满足项目HSE的要求负责。To be responsible to ensure the progress control can meeting HSE requirements.
任职资格qualifications:
1、从事化工项目工程计划及控制管理工作五年以上;at least 5 years’ experience of chemical industrial project schedule and control management.
2、熟练使用计算机办公软件,Project软件等,最好有使用主流项目管理软件进行项目进度计划管理的经验;familiar with office software and project software; the experience of using main stream project management software is preferred.
3、有较强的责任心,作风严谨,良好的团队合作精神,有较好的沟通、协调、组织能力和创新、学习能力;to have high sense of responsibility and rigorousness; teamwork player with good capabilities of communication, coordination, organization, innovation and learning.
4、具有设计院项目进度管理或化工大型项目进度管理控制工作经验者优先;the candidates with working experiences of design institute project schedule management or large scaled chemical industrial project schedule management control will be prevailing.
公司介绍
公司成立于2012年1月,注册资本4300万美元,合资双方各占50%股权,固定资产5.42亿元,主营业务为***橡胶的制造、研发、销售及进出口贸易。项目规划总产能6万吨/年,总投资约2亿美元,其中一期3万吨/年***橡胶装置于2015年7月正式投产运行,二期项目正在规划中。"