? The Project Engineer on site is responsible for ensuring the coordination between TNPJVC/CNI23, NIEP Supplier representatives on site (AREVA and CNPEC), AREVA PE, CNPEC PL for the management of activities resulting from open package inspections and leading to the closure of Consortium obligations as well as the treatment of pbs due to Purchaser responsibilities for which NI Supplier has to be compensated.
Job Duties:
? Be aware of applicable Project Procedures and Consortium Project Procedure for activities on site, such as but not limited to, OPI, CIN, NCR, Material return, Material re-supply, ECC clearance and proposes any modifications for improving the efficiency of such procedures
? To liaise between parties on site (OPI team, Installation & Commissioning support deputy manager, engineering teams) and AREVA PE and CNPEC PL
? To ensure that all the data are correctly filled in the relevant tools in order that the traceability is ensured, that means per ECS:CCC, ECC, NCR (whoever the responsible), GVN, MRF,...
? Expediting of actions resulting from OPI on site:
** From TNPJVC: GVN, NCR, request for re-supply ...
** From sub-suppliers: CIN to be approved by TNPJVC before implementation ...
until the issuance of ECC clearance certificate by TNPJVC as evidence of the closure of Consortium obligations for equipment supply and until closure of treatment of Purchaser's failures that the Consortium has decided to manage
? Expediting of Work Orders issued to CNI23
? Screening of TNPJVC requests during erection activities before interfacing with PE. If it is CR, it's one of the purpose of FDT on site to filter them. If it's specific request of support, it's obvious that it's necessary to make connection with the other branch on site (installation & commissioning support)
Job Requirements:
- Bachelor degree and above
- Experience about quality management
- Fluent English (read, write and speak); English is the day-to-day working language for that mission
- French language is not requested but will be appreciated.
Work location: Taishan city jiangmen (江门台山市)
Job Duties:
? Be aware of applicable Project Procedures and Consortium Project Procedure for activities on site, such as but not limited to, OPI, CIN, NCR, Material return, Material re-supply, ECC clearance and proposes any modifications for improving the efficiency of such procedures
? To liaise between parties on site (OPI team, Installation & Commissioning support deputy manager, engineering teams) and AREVA PE and CNPEC PL
? To ensure that all the data are correctly filled in the relevant tools in order that the traceability is ensured, that means per ECS:CCC, ECC, NCR (whoever the responsible), GVN, MRF,...
? Expediting of actions resulting from OPI on site:
** From TNPJVC: GVN, NCR, request for re-supply ...
** From sub-suppliers: CIN to be approved by TNPJVC before implementation ...
until the issuance of ECC clearance certificate by TNPJVC as evidence of the closure of Consortium obligations for equipment supply and until closure of treatment of Purchaser's failures that the Consortium has decided to manage
? Expediting of Work Orders issued to CNI23
? Screening of TNPJVC requests during erection activities before interfacing with PE. If it is CR, it's one of the purpose of FDT on site to filter them. If it's specific request of support, it's obvious that it's necessary to make connection with the other branch on site (installation & commissioning support)
Job Requirements:
- Bachelor degree and above
- Experience about quality management
- Fluent English (read, write and speak); English is the day-to-day working language for that mission
- French language is not requested but will be appreciated.
Work location: Taishan city jiangmen (江门台山市)
公司介绍
阿海珐集团 (AREVA)简介
AREVA集团凭借其遍布全球43个国家的生产设施以及100多个国家的销售网络,为客户提供高可靠性的技术用于电力生产。我们在核电领域处于世界领先地位,也是唯一的一家业务领域涉及核燃料循环各个环节的工业集团。
AREVA集团工业战略的基石为可持续发展,集团的50000名员工承诺不断改进日常工作,积极为该目标的实现而努力。
AREVA集团的业务开展旨在积极应对21世纪的最大挑战,即:在满足不断增长的电力需求的同时,保护环境,对子孙后代负责。
阿海珐集团 (AREVA) 在中国
阿海珐集团是世界排名第一的核能企业,它对中国核能发展作出了很多贡献。集团已经向大亚湾核电站、岭澳核电站以及其他一些大型核电站提供了核岛技术(包括各种产品和管理技术)。
我们立足本地生产,转让技术,同时吸引优秀的本地人才,并为员工提供完善的培训和发展计划以帮助我们的员工发挥潜能,有更好的发展方向和机会。我们立志成为行业内最受尊敬的雇主并成为员工向往和喜欢的工作场所。
更多详情请见:www.areva.com
AREVA集团凭借其遍布全球43个国家的生产设施以及100多个国家的销售网络,为客户提供高可靠性的技术用于电力生产。我们在核电领域处于世界领先地位,也是唯一的一家业务领域涉及核燃料循环各个环节的工业集团。
AREVA集团工业战略的基石为可持续发展,集团的50000名员工承诺不断改进日常工作,积极为该目标的实现而努力。
AREVA集团的业务开展旨在积极应对21世纪的最大挑战,即:在满足不断增长的电力需求的同时,保护环境,对子孙后代负责。
阿海珐集团 (AREVA) 在中国
阿海珐集团是世界排名第一的核能企业,它对中国核能发展作出了很多贡献。集团已经向大亚湾核电站、岭澳核电站以及其他一些大型核电站提供了核岛技术(包括各种产品和管理技术)。
我们立足本地生产,转让技术,同时吸引优秀的本地人才,并为员工提供完善的培训和发展计划以帮助我们的员工发挥潜能,有更好的发展方向和机会。我们立志成为行业内最受尊敬的雇主并成为员工向往和喜欢的工作场所。
更多详情请见:www.areva.com
联系方式
- 公司地址:上班地址:建国门外大街21号国际俱乐部办公大楼